If you are at the beginning of your building design journey, you may feel overwhelmed by all of the items that need to be addressed before you can get your building permit. The process can be challenging and costly, but if you know what you need ahead of time, you can avoid costs and delays.


Before you start a design:

Conservation Authorities:

Conservation authority guidelines and mapping for your jurisdiction must be checked. Most areas have interactive online maps, easily accessible to the public. Most conservation authorities dictate different areas that buildings are not permitted, and some areas that require permission before you can get your building permit. A site plan and an initial concept can usually suffice to apply for these permits, but depending on the area, permits can set you back thousands of dollars with no guarantee of permission.


Zoning requirements:

Every township has their own set of zoning by-laws which govern what size, location, and type of building can be built on any property. This will spell out how far you need to be from property lines, how tall you can build, what occupancies you can use your building for etc. An experienced review of these by-laws early on can save massive headaches down the road. In some cases, if a building cannot quite meet the zoning by-laws, a minor variance can be applied for to allow minor allowances on your property.



Building permit submissions:

Typical building permit submission requirements are listed below:


Building drawings

These are taken care of by the building designer/architect and include floor plans, elevations, sections, and any necessary details


Engineering

Simple houses often fall within the guidelines of the building code and do not require engineering. However, many houses have some details that will require engineering especially for things like timber frame structures, suspended concrete slabs, retaining walls, or unconventional structural details


Septic Design

If you live on a rural property with no access to water & sewer services, a septic design is required before a building permit will be given. This applies to new builds, and many additions and renovations.


Truss drawings

Most residential roofs in Ontario are built with engineered trusses which are premanufactured in a factory, brought to site, and set up on the walls. These trusses must be designed and submitted along with the building permit paperwork


HVAC design

Nearly all townships now require HVAC designs done by a licensed designer to accompany the building design. This includes duct sizing, heating type, and equipment layout.


Site plan/ grading plan

Every permit that includes an addition to the footprint of a building requires a site plan. Often for existing buildings, this site plan can be a fairly simple drawing based on historical site plans and completed by the building designer. New homes in urban areas typically require a grading plan completed by a surveyor showing exactly how water will drain from the property.


Permit forms

A building permit application form, schedule 1 designer form, energy efficiency design form, and often more are required for residential projects. Most of these forms will be completed by the building designer or the applicant.


Township fees

Building permit fees are generally a very tiny portion of the building costs, usually less than $5000 for most additions or renovations. However, development fees apply to new houses on undeveloped property, and these fess often cost upwards of $30,000. Always be aware of the fees charged by the town before you begin your design so you aren't hit with unexpected costs at the permit stage!


Collaborating with a skilled designer ensures they will guide you through these steps and alert you to potential issues before the design process begins. At Altus Home Design, we can handle all submission requirements, partnering with industry experts to ensure that all designs, drawings, and engineering form a unified permit submission, streamlining the review process to be as smooth and swift as possible.

 
 
 

Recent Posts

See All
Ontario ADU & Basement Apartments

Basic requirements for basement apartments & ADUs in Ontario Can I put an apartment in my house? In short – probably! Due to the strain on housing, rising house prices, and increase in immigration to

 
 
 
2024 Ontario Building Code Changes

Ontario is creating a new 2024 Ontario Building Code that comes into effect January 1, 2025. There are hundreds of minor changes with...

 
 
 

Comments


  • Facebook
  • Instagram

Get In Touch

Arthur, ON

Canada

519-820-9233

  • Instagram
  • Facebook

© 2024 by Altus Home Design. All rights reserved.

bottom of page